DOĞRU MÜHENDİSLİK is an independent engineering firm with 29 years of experience in transportation, urban infrastructure, structures, energy, and water resources projects, delivering safe, economical, and sustainable engineering solutions through an interdisciplinary approach and a boutique service mindset.
The Cuniş Regulator and Hydroelectric Power Plant (HPP) Project is located to the south of Hayrat District of Trabzon Province in the Black Sea Region.
The structures included in the project consist of the following components:
| Design Discharge | 6.00 m3/s |
|---|---|
| Number of Units | 3 units |
| Installed Capacity | 8.41 MW |
| Gross Head | 169.69 m |
| Total Energy | 31.94 GWh/year |
| Regulator Type | Tyrolean |
| Crest Length | 23.00 m |
| Transmission Channel Type | Rectangular Channel |
| Transmission Tunnel Type | Modified Horseshoe |
| Penstock Diameter | 1.30 m |